VATS BATTERYLithium Polymer Battery Manufacturer
EN ▾

OEM and ODM: from sample to mass production

OEM and ODM describe two different relationships with the same factory. This page explains both, using the factory profile's own description, and states what a buyer should confirm at each stage.

Since 2011681 models across 11 families512 Li-polymer modelsCustomers in 30+ countries every year (company profile states)500,000 pcs/day capacity (company profile states)ISO9001 / ISO14001, UL, CE, IEC62133, CB, KC, RoHS — Certificates available upon request
Send your battery inquiry — tell us voltage, capacity and size
length (mm) width POUCH CELL diagram, not a photograph

Dimension-callout pouch outline — the site's recurring diagram motif. It is a schematic, not a photograph of a product, factory or customer project.

Home / Guides

Under ODM, the factory contributes design: custom design, new mould development and electrical performance optimisation. Under OEM, the buyer brings a defined product and the factory contributes flexible production lines, large-volume manufacturing, precise quality control and reliable delivery. The distinction matters because it decides who owns the design decisions — dimensions, protection, test criteria — and therefore who must answer when a sample does not fit or perform.

The described process runs from engineering samples through design verification, testing, production, packaging, documentation and logistics. The sample stage is the critical control point: it proves fit in the real enclosure, runtime under the real load, and behaviour at peak current and operating temperature. Skipping or rushing the sample stage to save weeks usually costs months when a bulk order arrives wrong, and no supplier statement about flexible lead times replaces a proven sample.

For an OEM or ODM inquiry, send the enclosure drawing, the electrical requirements, the quantity band and ramp plan, the target markets and the documents you need. Certificates are available upon request for the finished design, and the certificate set should be agreed before tooling, because it can affect the design, the test plan and the schedule. Agree in writing what the sample must prove, what happens if it fails, and how mass-production quality will be checked — those three agreements are the project, and everything else is detail.